Electrical Installation at Sewage Treatment Plants

advertisement

Electrical Installation at Sewage Treatment Plants

Introduction

Electrical Installation at Sewage Treatment Plants
Electrical Installation at Sewage Treatment Plants


    The purpose of this Electrical Specification is to define Unity water requirements for manufactured electrical equipment and electrical installation works for Electrical Fixtures at Sewage Treatment Plants (STPs).The Specification defines quality, performance, reliability, durability, safety and appearance requirements for these installations.

This Specification applies to both complete and partial electrical design and installation works at Unitywater’s STPs. 

This includes, but is not limited to, the following:

• Electrical, instrument and control system design and documentation, preparation of workshop drawings, as constructed drawings, inspection and test plans, etc.;

• Design, supply and installation of all electrical switchboards, control panels and local control stations;

• Supply and installation of all electrical cabling, including power, control, fibre optic, data and communication, and cable supports, including cable ladder and conduit;

• Supply and installation of all electrical equipment including test results;

• Supply and installation of PLC/SCADA and site control networking equipment; and

• Electrical Hazardous Area Certification and verification documentation

Engineers Guide to MATLAB

advertisement

Table Of Contents

Design Requirements

Installation Requirements

Switchboards and Motor Control Centres

Control System

Instrumentation Technical Specifications

Motor Starters

Motors

Field Equipment

Light and Power

Uninterruptible Power Supply (UPS)

Power Factor Correction

Earthing

Active Harmonic Filters

Labelling

Appendix 1 – Mandated Equipment List